Enrollment Services, Phase 1 and 2 Renovations

California State University, Long Beach

Posted: November 11, 2020 | Projects

Brotman Hall is the administration building of California State University, Long Beach. It is home to the CSULB President’s office, as well as the Enrollment Services office (a highly visited space on campus).

Brotman Hall Enrollment Services in its remodeled state, with a modern, industrial aesthetic

The Phase 1 remodel of the Enrollment Services space covered 1,500 square feet.  The general contractor was C.W. Driver. It entailed the demolition of existing offices and conference rooms and the re-partitioning of the space to accommodate new, modern offices with large glass storefronts. The suite received new lighting, wood veneer paneling, carpet, ceilings and fresh paint.

The Phase 2 remodel of this space covered 4,000 square feet.  The general contractor was DPR Construction. It likewise entailed the demolition of existing offices and conference rooms and the re-partitioning of the space to accommodate new offices with modern glass storefronts. It also entailed a new large conference room, a coffee bar and hoteling area.  The existing concrete and brick walls were restored to give the space an industrial yet modern and professional aesthetic. The space was completed with new wood veneer paneling, carpet, ceilings and fresh paint.

Owner
California State University
401 Golden Shore
Long Beach, CA 90802

Phase 1

General Contractor - C. W. Driver, LLC

Date Bid: May 2017
Construction Period: May 2017 to Jul 2017
Total Square Feet: 1,500
Number of Buildings: One.
Basic Construction Type: Renovation. 
Foundation: N/A.
Exterior Walls: N/A.
Roof: N/A.
Floors: Concrete. 
Interior Walls: Metal stud drywall.

Phase 2

General Contractor - DPR Construction 

Date Bid: Sep 2018
Construction Period: Oct 2018 to Apr 2019         
Total Square Feet: 4,097
Number of Buildings: One.
Basic Construction Type: Renovation. 
Foundation: N/A.
Exterior Walls: Masonry.
Roof: N/A.
Floors: Resilient. 
Interior Walls: Metal stud drywall, glass & glazing.

Click here to view the full cost details for this project in the November/December 2020 issue of DCD