East Lake Fire Station 32

Long & Associates Architects/Engineer, Inc.

Posted: March 11, 2020 | Projects

This project created an enlarged version of the prototype station for Hillsborough County Fire Rescue, to better serve the growing East Lake area of Northeast Hillsborough County.

Photo Courtesy of DaveMoorePhoto.com

The 12,000-square-foot facility includes an apparatus area consisting of four double bays for Fire Rescue vehicles and other auxiliary equipment.  Additionally, the work and living space provides 13 individual bunk spaces, dining and day room, a commercial grade kitchen, employee restrooms, shower facilities, laundry, an exercise room, a safe room, a command center, a telecom room, a mechanical room, and storage facilities. 

These fire rescue stations are designed and detailed to blend with the character of the individual residential neighborhoods they serve. Exterior materials are highly durable and low maintenance, to provide lower total cost over a longer service life for the facility.  The building envelope and MEP systems are high-efficiency, high-performance ,and supported by a full-load backup generator.

Exterior amenities include barbeque patio, a truck and equipment fueling station, and xeriscape native landscaping.  Interior amenities include an exercise room, a Command Center, private Captain’s Bunk, private Shift Commander’s Office, bunker gear storage off the apparatus bays, crew work room, and a large open-plan kitchen and multi-purpose gathering space.

Full civil site design services included preparation of construction documents depicting demolition of an existing building, geometry, pavement section design and striping, grading, drainage, stormwater management system design, erosion control, potable/fire water design, sanitary sewer design, and related details of the work to be performed.  

The engineering and design of the stormwater management system included the preparation of the calculations and drawings required to meet the regulatory requirements of Hillsborough County Development Services, the Florida Department of Transportation (FDOT), and the Southwest Florida Water Management District (SWFWMD).  

Roofing: PAC-CLAD®
Windows: Winco
Entrances & Storefronts:  YKK AP America
Flooring: Daltile, Armstrong
Lighting: H.E. Williams

Architect, Cost Estimater, Structural, Mechanical, Electrical & Civil Engineer
Long & Associates Architects/Engineer, Inc.
4525 S. Manhattan Avenue
Tampa, FL 33611
www.longandassociates.com

General Contractor
New Vista Builders Group, LLC
4906 N. Manhattan Avenue
Tampa, FL 33614

Date Bid: Jun 2017
Construction Period: Aug 2017 to Aug 2018          
Total Square Feet: 11,685
Site: 12 acres.
Number of Buildings: One.

Building Sizes: First floor, 11,685; total, 11,685 square feet.  
Building Height: First floor, 37’; total, 37’.  
Basic Construction Type: New.
Foundation: Cast-in-place, reinforced concrete, slab-on-grade. 
Exterior Walls: CMU.
Roof: Metal. 
Floors: Concrete.
Interior Walls: CMU, metal stud drywall.
KBTU/SF/yr: 30.33

Click here to view the full cost details for this project in the March/April 2020 issue of DCD