| |
 |
September/October
2011 |
DCD Square Foot Cost Analysis Metal Exterior & Roof
The Building Cost Per Square Foot Analysis is compiled from actual new
construction projects published by Design Cost Data™ magazine. This guide
provides DCD readers a quick comparison of building construction costs on
similar size projects.
Analysis
Archive
|
Read more
DCD Technical Articles
LEGALLY SPEAKING: What’s in Store for LEED? Second Comment Period Open for LEED
2012
In what has been unofficially called LEED 2012, the U.S. Green Building Council
(“USGBC”) opened the second public comment period from August 1 to September 14,
2011 for the next version of the LEED® rating system. According to the USGBC, a
public comment period helps ensure that LEED continues to be at the vanguard of
innovative design construction and operation of buildings and communities.
The final version, which is expected to be released in late
2012, has some noteworthy proposed changes. First, LEED 2009 has 9 prerequisites
and 49 credits, while the new draft has 15 prerequisites and 49 credits. Second,
there are now 10 different categories in the new draft, as opposed to 7
categories in the prior versions. The three new categories, as well as some
changes and additions to the existing categories, are explained in more detail
below. Overall, these changes are either new credit categories, changes to the
technical requirements, or revised point distribution.
Technical Articles
Archive |
Read more
DCD Builder Product Revue
Thermomass Delivers Energy Efficient Building to Party Time Plus
Party Time Plus is the largest exclusive party rental company in Montana.
As a full service company, Party Time Plus provides everything for weddings,
picnics, parties, trade shows or any special event in Montana, Wyoming and the
Dakotas. As a growing business, they needed a new home that would serve their
clients and their needs. AT Architecture of Billings delivered a new home that
not only was attractive but efficient, highly insulated and move-in ready in a
short time.
Builder Product Revue Archive
|
Read more
Reformulated Garland StressPly® E High-Tensile Membrane Now More Eco-Friendly
Garland’s newest StressPly® E (Environmental) modified bitumen membrane
offers 500 lbf./in. of tensile strength, a variety of post- and pre- consumer
recyclable materials, and rapidly renewable resources for increased
sustainability. This high-strength, puncture- and fatigue-resistant membrane
makes an ideal waterproofing and reinforcement layer for applications demanding
a high level of environmental responsibility.
Builder Product Revue Archive
|
Read more
DCD InSights
Pre-Engineered Building Works for Multi-Purpose Center
South Tippah School District envisioned a multi-use center that would be an
integral part of the school district and the community. From the very beginning
of the Programming Phase, Shafer & Associates Architects worked with the
district to design a building that would fulfill the needs of the district as
well as the community.
Insights
Archive |
Read more
Greenbrier Middle School a Model of Good Design
Jackson Brown King Palculict Architects of Little Rock is dedicated to
delivering projects that meet their client’s goals and needs. Their client, the
School District of Greenbrier, Arkansas wanted a new middle school that followed
the sustainable practices of today.
Insights
Archive |
Read more
High-Performance Glass for High-Performance Schools
Daylighting strategies can have a significant impact on energy consumption in
educational facilities, particularly those that incorporate advanced solar
control, low-e glasses such as double-silver-coated Solarban 60 glass and
triple-silver-coated Solarban 70XL glass by PPG, both of which were specified
for CY Middle School (featured on page 36 of this issue).
Insights
Archive |
Read more
DCD
Cost Trends
Construction Cost Trends for 2011
Depending on the part of the country, housing is bottoming out and even showing
signs of recovery. Nevertheless, fully 20% of home loans are “under water” and
the effects of this remain to be realized. So we cautiously say that a further
steep decline is probably not going to happen and that we should be starting to
crawl out of the housing mess over the next three years.
Trends Archive |
Read more
The DCD Square Foot Cost Guide for Buildings with Metal Construction
Design Cost Data™ magazine includes a Building Sq. Ft. Cost
Guide in each issue. These square foot cost guides have been assembled from
projects in our database, the DCD Archives™ online at DCD.COM. These guides are
provided to the industry by DCD as a benchmark for future building costs.
DCD Cost Guides
Archive |
Read
more
| |
|
Case Studies Case Studies Archive |
|
File: Civic
• Wayne
Township Fire Department Building
Goshen, Ohio
File: Commercial
• Westinghouse Electric Company
Corporate Headquarters
Cranberry, Pennsylvania
LEED® Basic
• Sarasota Yacht Club
Sarasota, Florida
• Party Time Plus
Billings, Montana
• Roanoke Electric Cooperative
Ahoskie, North Carolina
File: Educational
• Greenbrier
Middle School
Greenbrier, Arkansas
• Ripley High School
Event Center
Ripley, Mississippi
• CY Middle School
Casper, Wyoming
File: Industrial
• Manzana Products
Sebastopol, California
• Sonoma Wine Company
Graton, California
File: Recreational
• California State
University, Chico Wildcat Recreation Center
Chico, California
LEED® Gold Certified
File: Religious
• Good Shepherd Church
Naperville, Illinois
|
|

|
|
Advertiser
Index
|
|
Reprints Available from DCD: Contact DCD at
(800) 533-5680 for pricing. »
Learn more
|
|