Educational
Project Archive
| Current Issue |
|
May/June
2013 |
|
| Past Issues |
March/April
2013 |
-
The Clyde Muse
Center, Hinds Community College Rankin Campus - Pearl,
Mississippi
Construction Period: July 2009 to Mar 2011 Total Square Feet: 75,696
-
Tapestry
Charter School - Buffalo, New York
Construction Period: Sep 2010 to Sep 2011 Total Square Feet: 43,047
-
Rider
University North Hall - Lawrenceville, New Jersey
Construction Period: June 2010 to July 2011 Total Square Feet: 22,658
LEEDฎ Gold
-
Early Childhood Center, Mount Hood Community College - Gresham,
Oregon
Construction Period: Oct 2010 to Sep 2011 Total Square Feet: 22,740
-
Teague Learning Commons, Lancaster Bible College - Lancaster,
Pennsylvania
Construction Period: Mar 2011 to Aug 2012 Total Square Feet: 41,637
-
Hill Farm
Elementary - Bryant, Arkansas
Construction Period: Aug 2011 to Aug 2012 Total Square Feet: 88,800
|
|
January/February
2013 |
|
|
November/December
2012 |
|
|
September/October
2012 |
-
Kennedy Middle School - Pharr,
Texas
Construction Period: Aug 2008 to Dec 2009 Total Square Feet: 156,706
|
|
July/August
2012 |
|
|
May/June
2012 |
|
|
March/April
2012 |
-
Ridgewood High School Gymnasium Addition
- Norridge, Illinois
Construction Period: Aug 2008 to Feb 2010 Total Square Feet: 67,772
-
Rochester Memorial Elementary School
- Rochester, Massachusetts
Construction Period: Apr 2010 to Aug 2011 Total Square Feet: 105,023
-
Maurice J. Gallagher Jr., Hall &
Conference Center, UC Davis Graduate School of Management -
Davis, California
Construction Period: Feb 2008 to Sep 2009 Total Square Feet: 82,700
-
Health Science Education Center, Central
Community College - Grand Island, Nebraska
Construction Period: Feb 2009 to July 2010 Total Square Feet: 44,194
-
Davis Building, Manatee High School
- Bradenton, Florida
Construction Period: Dec 2009 to May 2011 Total Square Feet: 71,176
-
Pope John Paul II High School -
Royersford, Pennsylvania
Construction Period: June 2008 to May 2010 Total Square Feet: 208,423
-
Campus Center Central Texas College
- Killeen, Texas
Construction Period: Apr 2010 to Aug 2011 Total Square Feet: 48,583
-
Timberline Learning Center -
Breckenridge, Colorado
Construction Period: Aug 2007 to Aug 2008 Total Square Feet: 8,256
|
|
January/February
2012 |
|
|
November-December
2011 |
-
Casey Middle School - Boulder,
Colorado
Construction Period: Dec 2008 to July 2010 Total Square Feet: 120,983
LEEDฎ for Schools Platinum Pending
-
Bismarck High School - Bismarck,
Arkansas
Construction Period: Dec 2008 to May 2010 Total Square Feet: 81,327
LEEDฎ Silver Pending
-
Johnston Community College Learning
Resource Center - Smithfield, North Carolina
Construction Period: Dec 2009 to July 2011 Total Square Feet: 33,443
LEEDฎ Pending
-
Wofford College Goodall Environmental
Studies Center - Glendale, South Carolina
Construction Period: Sep 2008 to May 2009 Total Square Feet: 2,174
Awarded LEEDฎ Platinum
-
Summit Elementary School - Casper,
Wyoming
Construction Period: Apr 2009 to Aug 2010 Total Square Feet: 61,472
Sustainable
-
V. Sue Cleveland High School - Rio
Rancho, New Mexico
Construction Period: July 2007 to July 2009 Total Square Feet: 410,848
LEEDฎ Silver Pending
-
Music Education & Performance Building,
Florida Gulf Coast University - Fort Myers, Florida
Construction Period: Sep 2009 to Sep 2010 Total Square Feet: 29,148
LEEDฎ Gold
|
|
September-October
2011 |
|
|
July-August
2011 |
|
|
May-June
2011 |
|
|
March-April
2011 |
|
|
January-February
2011 |
|
|
November-December
2010 |
-
LEEDฎ Silver Pending
Greater Gentilly High School - New
Orleans, Louisiana
Construction Period: Aug 2008 to Dec 2009 Total Square Feet: 174,128
-
LEEDฎ Gold Pending
Colorado State University Indoor Practice
Facility - Fort Collins, Colorado
Construction Period: Sep 2008 to Aug 2009 Total Square Feet: 65,325
-
LEEDฎ Gold
Colorado State University Academic &
Training Center - Fort Collins, Colorado
Construction Period: Dec 2008 to Aug 2009 Total Square Feet: 17,136
-
LEEDฎ Platinum
St. Olaf College, Regents Hall of Natural
& Mathematical Sciences - Northfield, Minnesota
Construction Period: Jan 2007 to Oct 2008 Total Square Feet: 196,187
-
LEEDฎ Platinum
King Pavilion Iowa State University,
College of Design - Ames, Iowa
Construction Period: Aug 2008 to July 2009 Total Square Feet: 22,000
|
|
September-October
2010 |
|
|
July-August
2010 |
|
|
May-June
2010 |
|
|
March-April
2010 |
|
|
January-February
2010 |
-
The Tatnall School Performing Arts Center
- Wilmington, Delaware
Construction Period: Nov 2005 to July 2007 Total Square Feet: 25,000
-
Western Campus Addition & Renovation,
Wayne County Community College District - Belleville, Michigan
Construction Period: Nov 2006 to Oct 2008 Total Square Feet: 63,900
-
West Virginia University Erickson Alumni
Center - Morgantown, West Virginia
Construction Period: June 2007 to Sept 2009 Total Square Feet: 48,000
-
SUSTAINABLE
Rutt Academic Center, Lancaster Mennonite
School - Lancaster, Pennsylvania
Construction Period: Oct 2007 to Oct 2008 Total Square Feet: 22,000
|
|
November-December
2009 |
|
|
September-October
2009 |
|
|
July-August
2009 |
|
|
May-June
2009 |
-
John-Paul II Education Center, St. Marks
Catholic Church - San Marcos, California
Construction Period: Apr 2006 to Aug 2007 Total Square Feet: 25,530
-
Olsen Hall, Nichols College -
Dudley, Massachusetts
Construction Period: May 2008 to Aug 2008 Total Square Feet: 11,280
-
Coral Park Education Center -
Coral Springs, Florida
Construction Period: Oct 2005 to July 2006 Total Square Feet: 12,000
-
Salem Hills High School - Salem,
Utah
Construction Period: Mar 2006 to Aug 2008 Total Square Feet: 244,937
|
|
January-February
2009 |
|
|
September-October
2008 |
|
|
July-August
2008 |
|
|
May-June
2008 |
|
|
March-April
2008 |
|
|
January-February
2008 |
|
|
November-December
2007 |
- Great Seneca Creek Elementary School - Germantown, Maryland
Construction Period: Mar 2005 to Aug 2006 Total Square Feet: 82,511
- Twin Lakes Elementary School - Elk River, Minnesota
Construction Period: Aug 2005 to Dec 2006 Total Square Feet: 98,200
- Hope Commons Dining Hall - Kingston, Rhode Island
Construction Period: Jan 2006 to Aug 2007 Total Square Feet: 42,000
- University of Florida, Library West Addition-Remodeling - Gainesville, Florida
Construction Period: Dec 2003 to May 2006 Total Square Feet: 176,700
- McGinnis Education Center - Sharpsburg, Pennsylvania
Construction Period: May 2004 to Feb 2005 Total Square Feet: 10,752
|
|
September-October
2007 |
|
|
May-June
2007 |
|
|
May-June
2007 |
|
|
March-April
2007 |
Mountain Range High School - Westminster, Colorado
Construction Period: Apr 2004 to July 2006 Total Square Feet: 247,000
Science and Technology Hall, Slippery Rock University - Slippery Rock, Pennsylvania
Construction Period: June 2004 to Feb 2006 Total Square Feet: 73,406
Raven Stream Elementary School - New Prague, Minnesota
Construction Period: Apr 2005 to Aug 2006 Total Square Feet: 90,157
|
|
January-February
2007 |
Lehigh Acres Staging School - Lehigh Acres, Florida
Construction Period: July 2004 to July 2005 Total Square Feet: 100,000
Football Strength & Conditioning Facility, Syracuse University - Syracuse, New York
Construction Period: Apr 2005 to Oct 2005
Total Square Feet: 13,000
|
|
November-December
2006 |
LEEDฎ SILVER PENDING
Furman Hall, Furman University
- Greenville, South Carolina
Construction Period: Dec 2003 to Aug 2005 Total Square Feet: 68,000
LEEDฎ SILVER
Homewood Middle School - Homewood, Alabama
Construction Period: Mar 2003 to Dec 2004 Total Square Feet: 180,000
|
|
September-October
2006 |
Abbeville High School - Abbeville, Alabama
Construction Period: July 2004 to Dec 2005 Total Square Feet: 110,000
Student Life Center, Lancaster Christian School
- Lancaster, Pennsylvania
Construction Period: Mar 2004 to Dec 2004 Total Square Feet: 19,095
Suny Oswego Poucher Hall Rehabilitation, State University of New York College - Oswego, New York
Construction Period: Jan 2005 to Dec 2005 Total Square Feet: 37,500
|
|
July-August
2006 |
Kanbar Hall, Bowdoin College - Brunswick, Maine
Construction Period: June 2003 to Sep 2004 Total Square Feet: 26,000
Ft. Herriman Middle School -
Herriman, Utah
Construction Period: June 2004 to Aug 2005 Total Square Feet: 189,600
Indian River High School - Dagsboro, Delaware
Construction Period: Sep 2002 to Mar 2005 Total Square Feet: 146,443
Minnesota School of Business - Waite Park, Minnesota
Construction Period: June 2004 to Oct 2004 Total Square Feet: 40,500
Independence School - Newark, Delaware
Construction Period: May 2003 to Mar 2005 Total Square Feet: 66,000
|
|
May-June
2006 |
Youth Middle School
-
Monroe, Georgia
Construction Period: Dec 2002 to July 2004 Total Square Feet: 141,720
Midway Studios
-
Boston, Massachusetts
Construction Period: Dec 2003 to Oct 2005 Total Square Feet: 203,280
Hartford Job Corps
-
Hartford, Connecticut
CHILD
CARE BUILDING
Construction Period: Jan 2003 to June 2005 Total Square Feet: 6,075
ADMINISTRATION-WELLNESS
CENTER
Construction Period: Jan 2003 to June 2005 Total Square Feet: 8,600
CAFETERIA
Construction Period: Jan 2003 to June 2005 Total Square Feet: 7,730
DORMITORY
Construction Period: Jan 2003 to June 2005 Total Square Feet:
29,458
HEAVY
VOCATIONAL BUILDING
Construction Period: Jan 2003 to June 2005 Total Square Feet:
6,872
LIGHT
VOCATIONAL
BUILDING
Construction Period: Jan 2003 to June 2005 Total Square Feet:
13,779
RECREATIONAL
BUILDING
Construction Period: Jan 2003 to June 2005 Total Square Feet:
11,300
WAREHOUSE
Construction Period: Jan 2003 to June 2005 Total Square Feet:
3,800
|
|
March-April
2006 |
Estes Family Middle School Building, Kingswood Oxford School
-
West Hartford, Connecticut
Construction Period: May 2002 to Aug 2003 Total Square Feet: 26,862
Union Furnace Elementary School
-
Logan, Ohio
Construction Period: Dec 2002 to Aug 2004 Total Square Feet: 48,889
Sheldon Middle School
-
Sheldon, Iowa
Construction Period: Mar 2003 to Aug 2004 Total Square Feet: 84,700
|
|
November-December
2005 |
ECHO Academy
- Tiffin, Iowa
Construction Period: June 2003 to Dec 2003 Total Square Feet: 4,800
Emerson Unitarian Church, New Educational Building
- Houston, Texas
Construction Period: May 2003 to Mar 2004 Total Square Feet: 22,265
Conard Environmental Research Area Education Center
- Kellogg, Iowa
Construction Period: June 2004 to Apr 2005 Total Square Feet: 9,508
Mount Holyoke College Unified Science Center
- South Hadley, Massachusettes
Construction Period: May 2001 to Aug 2003 Total Square Feet: 127,700
|
|
September-October
2005 |
Aberdeen High School
-
Aberdeen, Maryland
Construction Period: Sep 2001 to Aug 2004 Total Square Feet: 206,442
Wabash College Hays Hall
-
Crawfordsville, Indiana
Construction Period: Sep 2000 to Aug 2003 Total Square Feet: 93,300
Butler University Lilly Hall
-
Indianapolis, Indiana
Construction Period: Jan 2002 to Jan 2003 Total Square Feet: 47,500
Lancaster Mennonite School, Ag Tech Facility
-
Lancaster, Pennsylvania
Construction Period: May 2004 to Sep 2004 Total Square Feet: 17,578
|
|
May-June
2005 |
Phillis Wheatley Middle School
-
Bridgeville, Delaware
Construction Period: Aug 2002 to Mar 2004 Total Square Feet: 64,000
Lamar Institute of Technology, Multi-Purpose Building
-
Beaumont, Texas
Construction Period: Aug 2003 to Jan 2005 Total Square Feet: 58,000
Pope John XXIII High School & Gym
-
Katy, Texas
Pope John XXIII High School
Construction Period: Jan 2004 to Aug 2004 Total Square 48,780
Pope John XXIII High School
Gym
Construction Period: Jan 2004 to Aug 2004 Total Square 16,433
Hocking Hills Elementary School
-
Logan, Ohio
Construction Period: Dec 2002 to Aug 2004 Total Square Feet: 45,578
Benjamin Franklin Elementary School
-
Terre Haute, Indiana
Construction Period: Mar 2003 to Aug 2004 Total Square Feet: 72,880
|
|
May-June
2005 |
Waverly City Schools PreK-12 Campus
- Waverly, Ohio
WAVERLY HIGH SCHOOL
Construction Period: Apr 2002 to Aug 2004 Total Square Feet: 132,574
WAVERLY MIDDLE SCHOOL
Construction Period: Apr 2002 to Aug 2004 Total Square Feet: 79,087
WAVERLY PRIMARY ELEMENTARY SCHOOL
Construction Period: Apr 2002 to Aug 2004 Total Square Feet: 69,938
WAVERLY INTERMEDIATE ELEMENTARY
SCHOOL
Construction Period: Apr 2002 to Aug 2004 Total Square Feet: 60,841
Athletic Field House, St. Lukes School
- New Canaan, Connecticut
Construction Period: Mar 2003 to May 2004 Total Square Feet: 30,700
Riley Child Development Center & Family Learning Center
- Pelzer, South Carolina
Construction Period: July 2003 to Apr 2004 Total Square Feet: 23,000
|
|
March-April
2005 |
Manuel Pena, Jr. Elementary School
Phoenix, Arizona
Construction Period: June 2002 to Jan 2004 Total Square Feet:
114,049
Chieftain Elementary School
Logan, Ohio
Construction Period: Dec 2002 to Aug 2004 Total Square Feet: 55,541
Youth Elementary School
Loganville, Georgia
Construction Period: July 2001 to July 2002 Total Square Feet: 103,760
|
|
January-February
2005 |
Two Rivers Middle School
East Hartford, Connecticut
Construction Period: Nov 2000 to Sep 2002 Total Square Feet: 120,008
Martin Luther King, Jr. High School
Lithonia, Georgia
Construction Period: Jan 2000 to Feb 2002 # Total Square Feet: 186,272
|
|
November-December
2004 |
LEEDฎ SILVER
Vermeer Science Center, Central College - Pella, Iowa
Construction Period: June 2001 to Aug 2003 Total Square Feet: 71,196
LEEDฎ CERTIFICATION PENDING
Forest Hills Fine Arts Center
- Grand Rapids, Michigan
Construction Period: July 2002 to Apr 2004 Total Square Feet: 63,000
|
|
September-October
2004 |
- The University Center, University of Michigan Dearborn
- Dearborn, Michigan
Construction Period: May 2002 to Oct 2003 Total Square Feet: 85,140
- Pandora-Gilboa PreK-12 School
- Pandora, Ohio
Construction Period: Feb 2002 to Dec 2003 Total Square Feet: 123,166
- Mariner Middle School
- Milton, Delaware
Construction Period: Mar 2002 to Aug 2003 Total Square Feet: 64,000
- Texas A&M University System, Scott & White Regional Health Sciences Education Center
- Temple, Texas
Construction Period: Feb 2001 to Jan 2003 Total Square Feet: 63,100
- Rehobeth High School
- Rehobeth, Alabama
Construction Period: Jan 2002 to Mar 2003 Total Square Feet: 120,530
- Cris Quinn Fine Arts Building, Monsignor Kelly Catholic High School
- Beaumont, Texas
Construction Period: May 2003 to Mar 2004 Total Square Feet: 7,982
|
|
May-June
2004 |
|
|
March-April
2004 |
- Fowler Elementary School - Fowler, Colorado
Construction Period: July 2002 to Aug 2003 Total Square Feet: 33,500
- Creekside Village Community Center - Amherst, New York
Construction Period: Mar 2002 to Aug 2002 Total Square Feet: 3,462
- Connecticut International Baccalaureate Academy - East Hartford, Connecticut
Construction Period: Sep 2001 to Aug 2003 Total Square Feet: 66,326
- Wabaunsee High School Additions & Renovations - Alma, Kansas
Construction Period: Nov 2001 to Jan 2003 Total Square Feet: 34,725
- Gregory-Portland High School - Portland, Texas
Construction Period: Mar 2001 to Sep 2002 Total Square Feet: 274,989
|
|
January-February
2004 |
|
|
November-December
2003 |
- University Center at Gaylord, M-TEC Educational Center
- Gaylord, Michigan
Construction Period: July 2000 to Feb 2002 Total Square Feet: 47,621*
- Tooele Elementary Schools
- Tooele, Utah
Construction Period: May 2001 to July 2002 Total Square Feet: 54,150
- Otter Creek Elementary School
- Elgin, Illinois
Construction Period: Aug 2001 to July 2002 Total Square Feet: 60,150
- McWillie Elementary School
- Jackson, Mississippi
Construction Period: July 2001 to Jan 2003 Total Square Feet: 69,700
- Wayne State University, Eugene Applebaum College of Pharmacy and Health Sciences
- Detroit, Michigan
Construction Period: Nov 1999 to May 2002 Total Square Feet: 270,000
|
|
September-October
2003 |
|
|
July-August
2003 |
|
|
May-June
2003 |
- Carlin Springs Elementary School
- Arlington, Virginia
Total
Square Feet: 88,521; Construction
Period: June 2000 to Sep 2001
- Lancaster General College of Nursing and Health Sciences
- Lancaster, Pennsylvania
Total
Square Feet: 19,920; Construction
Period: Sep 2001 to Aug 2002
- Juan N. Seguin Elementary School
- Houston, Texas
Total
Square Feet: 87,615; Construction
Period: Jan 2001 to June 2002
- D.C. Everest Middle School
- Muskegon, Michigan
Total
Square Feet: 169,800; Construction
Period: Dec 2000 to Aug 2002
- Grand Prairie Elementary School Addition
- Frankfort, Illinois
Total
Square Feet: 45,000; Construction
Period: May 2001 to Aug 2002
- St. Annes Episcopal School
- Middletown, Delaware
Total
Square Feet: 56,000; Construction
Period: June 2001 to Aug 2002
|
|
March-April
2003 |
|
|
January-February
2003 |
|
|
November-December
2002 | |
|
September-October
2002 | Rancho Santa Fe Elementary School
- Avondale, Arizona
Total
Square Feet: 88,037;
Construction Period: Dec 1999 to Sep 2001Student Activities Center Alterations,
Rider University - Lawrenceville, New Jersey
Total
Square Feet: 10,800;
Construction Period: Mar 2001 to Oct 2001 |
|
July-August
2002 | - Mesa Community College At Red Mountain
- Mesa, Arizona
Library & Classroom
Building;
Total
Square Feet: 34,150
Services &
Administration Building; Total
Square Feet: 31,740
Laboratories
& Classroom Building; Total
Square Feet: 30,515
Ironwood
Central Plant Building;
Total
Square Feet: 8,500
Total Project Square Feet:
104,905;
Construction Period: Mar 2000 to Aug 2001 - New Library Media Center, Santa Fe Christian School
- Solana Beach, California
Total
Square Feet: 14,878;
Construction Period: June 2000 to Apr 2001 - Atha Road Elementary School
- Monroe, Georgia
Total
Square Feet: 103,771;
Construction Period: Mar 2000 to Aug 2001
|
|
May-June
2002 | Orange Grove High School
- Orange Grove, Texas
Total
Square Feet: 102,266;
Construction Period: Oct 1998 to Jan 2001Cheyenne Mountain High School Academic Arts Building & Natatorium
- Colorado Springs, Colorado
Academic Building
Total
Square Feet: 26,600
Natatorium
Total
Square Feet: 21,000
Construction Period: Jun 2000 to Aug 2001St. Elizabeths High School Student Development Center
- Wilmington, Delaware
Total
Square Feet: 32,800;
Construction Period: Sep 2000 to Aug 2001 |
|
March-April
2002 | E.P. Todd Elementary School
- Spartanburg, South Carolina
Total
Square Feet: 116,300;
Construction Period: Apr 1999 to July 2000 |
|
January-February
2002 | Carvers
Bay Middle & High Schools - Georgetown, South Carolina
Middle School Total
Square Feet: 102,000
High School Total Square Feet: 169.000
Construction
Period: Mar 1999 to Aug 2000Southlake
Church & Christian Academy - Huntersville, North Carolina
Total
Square Feet: 32,626;
Construction
Period: Sep 2000 to July 2001Ferryway
School - Maldon, Massachusetts
Total
Square Feet: 138,381;
Construction
Period: July 1998 to Aug 1999Knight
Space Science Education Center & The Challenger Learning Center Of
Arizona - Peoria, Arizona
Total
Square Feet: 35,788;
Construction
Period: July 1999 to Aug 2000Live
' n Learn SMILE Center, Inc. - Birdsboro, Pennsylvania
Total
Square Feet: 9,495;
Construction
Period: July 2000 to Nov 2000New
Student Center, Clemson University - Clemson, South Carolina
Total
Square Feet: 109,003;
Construction
Period: Jan 1998 to Apr 2000Seminole Community College Oviedo Center
- Oviedo, Florida
Total
Square Feet: 117,000;
Construction
Period: Apr 1999 to Jan 2001Hollenbeck Hall, Wittenberg University
- Springfield, Ohio
Total
Square Feet: 63,400;
Construction
Period: Aug 1998 to Jan 2000 |
|
September-October
2001 | The
University of Michigan, Kellogg Building Expansion & Renovation - Ann Arbor, Michigan
Total
Square Feet: 59,206;
Construction
Period: July 1998 to June 2000Skaggs
Catholic Center - Draper, Utah
Total
Square Feet: 376,247;
Construction
Period: Aug 1997 to Dec 1999 |
|
July-August
2001 | |
|
May-June
2001 | |
|
March-April
2001 | - College of Architecture
Addition, Burchard Hall - Blacksburg, Virginia
Total
Square Feet: 42,423;
Construction Period Feb 1996 to Jun 1998 - Idaho Commons at the
University of Idaho - Moscow, Idaho
Total
Square Feet: 88,900;
Construction
Period July 1998 to Mar 2000 - Joe M. Pirtle
Elementary School, Belton Independent School District - Temple, Texas
Total
Square Feet: 81,049;
Construction
Period Jun 1998 to Jul 1999 - Wirth Middle School
- Cahokia, Illinois
Total
Square Feet: 34,800;
Construction
Period May 1999 to May 2000 - Nikola Tesa Educational
Opportunity School - Colorado Springs, Colorado
Total
Square Feet: 77,965;
Construction Period May 1998 to July 1999 - Cecil Community College
Careers Building - North East, Maryland
Total
Square Feet: 63,720;
Construction Period Jun 1997 to Apr 1999 - Montcalm Community
College, Beatrice E. Doser Building - Sidney, Michigan
Total
Square Feet: 38,013;
Construction Period Apr 1998 to Jul 1999
|
|
January-February
2001 | - New School of Management,
Delaware State University - Dover, Delaware
Total
Square Feet: 95,903;
Construction Period Nov 1996 to May 2000 - Oak Mountain High
School - Shelby County, Alabama
Total
Square Feet: 224,000;
Construction
Period Feb 1998 to Aug 1999 - Dillard Drive Middle &
Elementary School - Raliegh, North Carolina
Elementary School
Total
Square Feet: 83,580
Middle School
Total
Square Feet 151,236
Construction
Period Aug 1996 to May 1998 - Paul A. Elsner Library
& High Technology Complex and Life Science Building, Mesa Community
College - Mesa, Arizona
Total
Square Feet: 125,500;
Construction
Period Dec 1997 to Aug 1999
|
 |
|