Welcome to DCD.com!
ABOUT DCD    THE MAGAZINE    D4COST    CONTACT    HOME
Welcome to DCD.com!
CIVIC       COMMERCIAL       EDUCATIONAL      HOTEL       INDUSTRIAL       MEDICAL       RECREATIONAL       RELIGIOUS       RESIDENTIAL         

 Current Issue
 Click here to
 read the issue.
Click Here To Access The DCD Archives™
Subscriber Login


Content/Departments
   Current Issue
   Issue Archive
   Specifiers Spotlights
   Building Products Revue
   TradeWinds
   Technical Articles
   Insights
   Case Studies
   DCD Sq. Ft. Cost Guides

   Cost Trends


Advertising
   Media Kit

Subscriptions
   Free Subscription
   Subscribe
   DCD E-News Subscription

   

 

Find out how much this building will cost in your area today

with our online estimating tool, the DCD Archives.

Click Here to create a conceptual estimate instantly on this building

and hundreds of other RELIGIOUS projects.


DCD Subscribers Login Here

 

  St. Patrick Catholic Church & SchoolSt. Patrick Catholic Church & School

General Contractor & Cost Estimator

Sauer Incorporated
6959-2 Phillips Parkway Drive, South, Jacksonville, FL 32256
www.sauer-inc.com

General Description

Location: Jacksonville, Florida
Date Bid: Feb 2014 Construction Period: Apr 2014 to Mar 2015

St. Patrick Catholic Church
Total Square Feet: 14,139 Site: 11 acres.
Number of Buildings: One; seating 677.
Building Sizes: First floor, 11,828; balcony, 2,311; total, 14,139 square feet.
Building Height: First floor, 50’; balcony, 14’; total, 50’.
Basic Construction Type: New. Foundation: Cast-in-place, reinforced concrete, slab-on-grade. Exterior Walls: CMU. Roof: Asphalt shingles. Floors: Concrete, steel joist (balcony). Interior Walls: Metal stud drywall.

St. Patrick Catholic School
Total Square Feet: 23,227 Site: 11 acres.
Number of Buildings: Two; 13 classrooms, auditorium seating 224.
Building Sizes: First floor, 23,227; total, 23,227.
Building Height: First floor, 29’; total, 29’.
Basic Construction Type: New. Foundation: Cast-in-place, reinforced concrete, slab-on-grade, post tensioned slab. Exterior Walls: CMU. Roof: Asphalt shingles, built-up. Floors: Concrete. Interior Walls: Metal stud drywall.

Project Team

Architect: Ronald Scalisi Architects, P.A. - 1309 Saint Johns Bluff Road, N., #A5, Jacksonville, FL 32225
Structural Engineer: Lou Pontigo & Associates, Inc. - 420 Osceola Avenue, Jacksonville Beach, FL 32250
Mechanical Engineer: Gregory Engineering, Inc. - 4567 Deep River Place, Jacksonville, FL 32224
Electrical Engineer: John Searcy & Associates, Inc. - 6320 Saint Augustine Road, #2, Jacksonville, FL 32217
Landscape Designer: Janet O. Whitmill, R.L.A., Inc. - P.O. Box 5212, Jacksonville, FL 32247


St. Patrick Catholic Church and St. Patrick Catholic School had served North Jacksonville, Fla. for many years at 1429 Broward Road. To better serve the families and children of the parish, land was purchased and the parish embarked on a capital campaign several years ago.

Located 8 miles from the original location, the new church and school are located on an 11 acre site. The new church is a one-story, 14,000 square foot structure that includes a 677-seat sanctuary with an altar, ambo, tabernacle, choir loft, three confessionals, and a work sacristy. The Church also contains a narthex, restrooms, and a bookstore.

The first phase of the school is a multi-phase project consisting of two, one-story buildings. The first building includes a cafeteria with a stage, a full-service kitchen, and a mechanical room. The second building consists of 11 classrooms with smart technology, a media center, science lab, administrative offices, lobby, a conference room, and the nurse and the principal's office.

Responding to an RFP, and then being selected after interviewing with the building committee and parish priest, Sauer Incorporated was selected as construction manager. As the construction manager, Sauer worked closely with the entire team including the architect, engineers and owner's representatives. Sauer also served as the cost estimator for the project.

The project presented many challenges early as a result of very poor soils and an extended site permitting process. As a result of the delays and the absolute requirement to open the school for the upcoming year Sauer built a "temporary school" using portable classrooms and site work in order to get the facility open for the 2014 year. The permanent school was built during the school year and the students were then transitioned into the new building.

The first phase of St. Patrick School can accommodate 300 students up from 170 elementary-grade students. The new school also includes a pre-kindergarten and day care that was not available in the previous location. "By changing the location of the school, the diocese can provide high-quality Catholic education options for the families in North Jacksonville," said Kathleen Bagg, spokeswoman for the Diocese of St. Augustine.

St. Patrick Church is beautifully done in an old-world European design. Vaulted ceilings, stained glass, custom woodwork, chandeliers, and mahogany main entry doors were all incorporated into the design of the church.

As a result of going above and beyond to accommodate the early challenges with the site, Sauer developed a strong working relationship with St. Patrick's and looks forward to responding to their needs in the future. Students and parishioners alike are excited with their new facilities and know they will serve them for many years to come.

Product Information
Building Envelope: Argos
Roofing: Owens Corning
Windows: YKK AP America
Entrances & Storefronts: Steelcraft
Flooring: Armstrong, Tandus
Lighting: Vista, BDL, Cooper
 

D4COST Software