Welcome to DCD.com!
ABOUT DCD    THE MAGAZINE    D4COST    CONTACT    HOME
Welcome to DCD.com!
CIVIC       COMMERCIAL       EDUCATIONAL      HOTEL       INDUSTRIAL       MEDICAL       RECREATIONAL       RELIGIOUS       RESIDENTIAL         

 Current Issue
 Click here to
 read the issue.
Click Here To Access The DCD Archives™
Subscriber Login


Content/Departments
   Current Issue
   Issue Archive
   Specifiers Spotlights
   Building Products Revue
   TradeWinds
   Technical Articles
   Insights
   Case Studies
   DCD Sq. Ft. Cost Guides

   Cost Trends


Advertising
   Media Kit

Subscriptions
   Free Subscription
   Subscribe
   DCD E-News Subscription

   

 

Find out how much this building will cost in your area today

with our online estimating tool, the DCD Archives.

Click Here to create a conceptual estimate instantly on this building

and hundreds of other OFFICE projects.


DCD Subscribers Login Here

 

  289 Garry Street289 Garry Street

Architect

GWH Construction Management Services Ltd.
419 Laidlaw Boulevard, Winnipeg, Manitoba R3P 0K8
www.gwhcms.com

General Description

Location: Winnipeg, Manitoba
Date Bid: June 2013 Construction Period: July 2013 to Feb 2014
Total Square Feet: 7,506 Site: n/a.
Number of Buildings: One.
Building Size: Basement, 2,662 (not included in square feet of renovation); first floor, 2,662; second & third floor, 2,422; total, 7,506 square feet.
Building Height: Basement, 6’; first floor, 12’ second & third floor, 12’; total, 36’.
Basic Construction Type: Interior renovation. Foundation: Existing. Exterior Walls: Existing. Roof: Membrane. Floors: Wood. Interior Walls: Wood & metal stud drywall.

Project Team

Architect: SNH Architecture - 200-4 Fort Street, Winnipeg, Manitoba R3C 1C4
Structural Engineer: Wolfrom Engineering Ltd. - 345 Wardlaw Avenue, Winnipeg, Manitoba R3L 0L5
Mechanical Engineer: G Mech Engineering, Inc. - 5648 Betsworth Avenue, Winnipeg, Manitoba R3R 0L6
Electrical Engineer: Ibasa Enterprises - 30 Gendreau Avenue, Winnipeg, Manitoba R3V 1M6
Interior Designer: NADI Urban Design Studio - 300-289 Garry Street, Winnipeg, Manitoba R3C 1H3


The story behind 289 Garry Street is a true testament on how dedication and patience paid off in the renovation of this 100+ year-old character building, in downtown Winnipeg. Challenges included age, building code issues, and previous poor construction (much of which occurred without building permit).

Despite these challenges, the decision was made to purchase the 10,000-square-foot property with the intent to renovate and create office space for the owner occupied design firm, as well as additional leasable space for generating revenue.

The philosophy was simple:
Step 1: renovate the 3 usable floors, provide code compliant washrooms, exits and floor to floor separations, and connect the East and West portions of the 3rd floor with a link.
Step 2: Renovate each floor for tenancies. The building owner and first tenant would occupy the 3rd floor and the balance of the building would be leased to interested parties.

The path to get there was another story. With delays in obtaining the permits and the need for the owner/first tenant to move in before Christmas of 2013 the decision was made to begin construction in June.

The owner initially though that much of the existing building was salvageable but with new building code requirements, and as poor workmanship from numerous previous renovations became apparent, the challenges escalated for the design/build team. All who were involved had their skills, resources and patience tried over and over again throughout the ten-month project. The outcome is a reflection of the hard work and collaborative spirit that everyone brought to the table.

Many lessons were learned throughout this process with collaboration and a shared determination to wrestle success out of potential tragedy being the biggest. One additional important item to note is how absolutely critical it is to perform an extensive due diligence, especially in a renovation project of this scale. It is best to start by examining the code violations, developing a realistic budget and most importantly to not try to salvage poor construction work.

After 10 months of hard work this project was simply one of the most involved projects that the GWH Construction Management Services team had ever worked on. The design/build team managed to stay focused, working through multiple setbacks and challenges. The result is nothing but pride from the trades and compliments from guests and visitors at 289 Garry Street.

With the building now 66% leased up and well positioned within the downtown commercial real-estate market, 289 Garry Street is enjoying a new lease on life and showing a strong appraised revaluation. It would seem that the gamble has paid off.

Product Information
Roofing: Soprema Carpet: Tandus
Sheet Vinyl: Johnsonite
 