Welcome to DCD.com!
ABOUT DCD    THE MAGAZINE    D4COST    CONTACT    HOME
Welcome to DCD.com!
CIVIC       COMMERCIAL       EDUCATIONAL      HOTEL       INDUSTRIAL       MEDICAL       RECREATIONAL       RELIGIOUS       RESIDENTIAL         

 Current Issue
 Click here to
 read the issue.
Click Here To Access The DCD Archives™
Subscriber Login


Content/Departments
   Current Issue
   Issue Archive
   Specifiers Spotlights
   Building Products Revue
   TradeWinds
   Technical Articles
   Insights
   Case Studies
   DCD Sq. Ft. Cost Guides

   Cost Trends


Advertising
   Media Kit

Subscriptions
   Free Subscription
   Subscribe
   DCD E-News Subscription

   

 

Find out how much this building will cost in your area today

with our online estimating tool, the DCD Archives.

Click Here to create a conceptual estimate instantly on this building

and hundreds of other EDUCATIONAL projects.


DCD Subscribers Login Here

 

  Palmer Catholic AcademyPalmer Catholic Academy

Architect

Sauer Inc.
6959-2 Phillips Parkway Drive South, Jacksonville, FL 32256
www.sauer-inc.com

General Description

Location: Ponte Vedra Beach, Florida
Date Bid: May 2011 Construction Period: June 2011 to Oct 2012
Total Square Feet: 34,209 Site: 5.5 acres.
Number of Buildings: One, 6 classrooms, 600 seat gymnasium.
Building Sizes: First floor, 18,960; second floor, 15,249, total 34,209 square feet.
Building Height: First floor,13’; second floor, 14’ 4”; total, 34’ 10”.
Basic Construction Type: Addition/Renovation.
Foundation: Cast-in-place, reinforced concrete, slab-on-grade.
Exterior Walls: CMU. Roof: Built-up, metal. Floors: Concrete.
Interior Walls: CMU, metal stud drywall.

Project Team

Architect: Ebert, Norman, Brady Architects, P.A. - 1361 13th Avenue S, #230, Jacksonville, FL 32250
Mechanical & Electrical Engineer: Powell & Hinkle Engineering, P.A. - 1409 Kingsley Avenue, Bldg. 12A, Orange Park, FL 32073
Structural Engineer: Atlantic Engineering Services - 6501 Arlington Expressway, #201, Jacksonville, FL 32211
Landscape Architect: HDR Engineering, Inc. - 200 W. Forsyth Street, #800, Jacksonville, FL 32800
Civil Engineer: Skiles, Davis & Banker, P.A. - 1633 San Marco Blvd., #5, Jacksonville, FL 32207


This new, two-phase project includes a classroom addition and a gymnasium for the 450 children attending Palmer Catholic Academy in kindergarten through eighth grade.

The first phase of this project included second story addition of classrooms, an administrative room, and a teachers' lounge. In addition, two existing classrooms on the first floor were renovated into a student lunch room. This phase of the project also included the addition of a 36-space asphalt parking lot over underground rain storage tanks, the installation of fire sprinklers throughout the existing school building, and the relocation of the electrical transformer and sewage lift station in preparation for phase two. The first phase was completed in 8 ˝ weeks over summer break - the tight schedule required working weekends, extended hours, and at night.

The second phase of this project included the two-story Parish Gymnasium. The new facility includes a basketball and volleyball courts, bleachers, a concession area, locker rooms, a stage, music and youth rooms, and meeting rooms. This phase of the project also included covered walkways, additional parking, and landscaping. Due to the location of the new building within the campus, construction work was carefully planned to ensure that the campus remained fully operational at all times. Additionally, the entire construction area was fenced in to maintain a separation between school activities and construction activities.

Product Information
Roofing: Soprema, Imetco
Windows: YKK-AP
Entrances & Storefronts: YKK-AP
Elevators: Schindler
Lighting: Day-Brite, Capri, Beghelli, Gardco
 

D4COST Software