Welcome to DCD.com!
ABOUT DCD    THE MAGAZINE    D4COST    CONTACT    HOME
Welcome to DCD.com!
CIVIC       COMMERCIAL       EDUCATIONAL      HOTEL       INDUSTRIAL       MEDICAL       RECREATIONAL       RELIGIOUS       RESIDENTIAL         

 Current Issue
 Click here to
 read the issue.
Click Here To Access The DCD Archives™
Subscriber Login


Content/Departments
   Current Issue
   Issue Archive
   Specifiers Spotlights
   Building Products Revue
   TradeWinds
   Technical Articles
   Insights
   Case Studies
   DCD Sq. Ft. Cost Guides

   Cost Trends


Advertising
   Media Kit

Subscriptions
   Free Subscription
   Subscribe
   DCD E-News Subscription

   

 

Find out how much this building will cost in your area today

with our online estimating tool, the DCD Archives.

Click Here to create a conceptual estimate instantly on this building

and hundreds of other EDUCATIONAL projects.


DCD Subscribers Login Here

 

  Jacksonville Country Day School Multi-Purpose Gymnasium BuildingJacksonville Country Day School Multi-Purpose Gymnasium Building

General Contractor & Cost Estimator

Sauer Incorporated
6959-2 Phillips Parkway Drive, South, Jacksonville, FL 32256
www.sauer-inc.com

General Description

Location:
Jacksonville, Florida
Date Bid: Aug 2011
Construction Period: Sept 2011 to Aug 2012
Total Square Feet: 22,844 Site: 2.5 acres.
Number of Buildings: One.
Building Size: First floor, 16,555; second floor, 6,289;
total, 22,844 square feet.
Building Height: First floor 14’; second floor 10’; mezzanine 24’; total, 40.3’.
Basic Construction Type: New. Foundation: Cast-in-place, slab-on-grade.
Exterior Walls: Tilt-up concrete, brick. Roof: Asphalt shingles, built-up. Floors: Concrete. Interior Walls: CMU, metal stud drywall.

Project Team

Architect, Mechanical & Electrical Engineer: RS&H - 10748 Deerwood Park Blvd. South, Jacksonville, FL 32256


The Smith Center is the multi-purpose gymnasium building at the Jacksonville Country Day School in Jacksonville, Florida. The Center includes a gymnasium, locker rooms, coach's office, snack bar, tutoring rooms, Language Arts classroom, dance/karate studios, multi-purpose meeting rooms, and outdoor restrooms for the adjacent swimming pool.

Extensive relocation of the existing underground utilities prior to the commencement of the building construction was needed. This included excavation of a new large storm retention pond and the filling in of two existing storm retention ponds and associated storm piping. Additionally, new water and sanitary sewer piping was installed for the building. A new electrical transformer was installed which required new underground electrical service and the demolition of the existing electrical transformer.

Sauer Incorporated carefully planned the phasing of the construction due to the location of the new building within the campus as the campus was fully operational at all times during construction. Temporary roads were placed and the entire construction area was fenced in to maintain a separation between school activities and construction activities.

Completed in August 2012, the Smith Center was ready for the students when the new school year began.

Product Information
Roof: Certainteed, Soprema
Lighting: Peerless, ELP, Lithonia, SPI, Hulite, Lumex, Focal Point
Windows: Crawford Tracy
Elevator: Schindler
 

D4COST Software