West
Calcasieu Cameron Hospital, ICU and Radiology Addition
Architect
The Estopinal Group
903 Spring Street, Jeffersonville, IN 47130
www.teg123.com
General Description
Location: Sulphur, Louisiana
Date Bid: May 2007 Construction Period: Jan 2008 to Apr
2010
Total Square Feet: 49,285 Site: 22 acres. Number of
Buildings: One; 101 Beds. Building Size: First floor, 24,904;
second floor, 20,955; third floor, 3,426; total, 49,285 square feet.
Building Height: First floor, 14’4”; second floor, 15’; third floor,
14’; total, 43’4”. Basic Construction Type: Addition.
Foundation: Pier & grade beam. Exterior Walls: Brick,
curtainwall. Roof: Built-up. Floors: Concrete. Interior
Walls: Metal stud drywall.
Construction Team
Structural Engineer: TRC Worldwide Engineering - 217 Ward Circle,
Brentwood, TN 37027
General Contractor: Bessette Development Corporation - 3025 Lake
Street, Lake Charles, LA 70601
Mechanical & Electrical Engineer: The Estopinal Group - 903
Spring Street, Jeffersonville, IN 47130
Civil Engineer: Meyer & Associates - 600 Cities Service Highway,
Sulphur, LA 70664
West Calcasieu Cameron Hospital located in Sulphur, Louisiana is a part
of the southwestern Louisiana Gulf Coast region for the past 57 years.
The hospital was established as a community hospital in 1953 in which
the hospital has provided experienced physicians, skilled health care
professionals, state of the art medical technology and a great
reputation for caring for their patients. Their primary market includes
Calcasieu and northern Cameron parishes, but patients come as far as
Southeast Texas for medical care.
West Calcasieu Cameron Hospital is a 101-bed hospital in which this is
the second major addition in its history. Construction for the Radiology
and ICU expansion project began in early 2008 and was funded by the
taxpayer approved $25 million capital bond issue of 2006. This addition
is part of a three phase construction project in which this is phase
one. Phase one includes the following:
The First Floor has the Diagnostic Imaging with an MRI, Nuclear
Medicine, CT, Ultrasound, Mammography, X-Ray Rooms and a Cath Lab. This
addition is now the new front door for the hospital with plenty of
parking for patients, drop off canopy and four private registration
booths. The Diagnostic Imaging Department is adjacent to the Emergency
Department.
The Second Floor has the Intensive Care Unit with twelve new beds, large
waiting room for ICU patients, waiting room for Surgery patient families
and Respiratory Therapy. ICU is adjacent to the Surgery Department.
The Third Floor is a mechanical Penthouse and will be used as a
connection to the patient tower that will be constructed in a later
phase.
There are two remaining phases in the master plan, phase two will
feature a new patient tower with outpatient services on the ground level
and phase three will expand the laboratory, dietary and materials
management departments. When all three phases are complete this will be
considered a replacement hospital on the existing site.
Product Information
Brick: Acme Waterproofing: Carlisle
Built-Up Roof: The Garland Company
Flooring: Tarkett Lighting: Lithonia
Curtainwall: International Aluminum Corporation
Entrances & Storefronts: Mesker Door
Daylighting & Skylights: Oldcastle BuildingEnvelope™ |
|

|