Welcome to DCD.com!
ABOUT DCD    THE MAGAZINE    D4COST    CONTACT    HOME
Welcome to DCD.com!
ISSUE ARCHIVE     CURRENT ISSUE     CASE STUDIES   

 Current Issue
 Click here to
 read the issue.
Click Here To Access The DCD Archives™
Subscriber Login

Content/Departments
   Current Issue
   Issue Archive
   Specifiers Spotlights
   Building Products Revue
   TradeWinds
   Technical Articles
   Insights
   Case Studies
   DCD Sq. Ft. Cost Guides

   Cost Trends


Advertising
   Media Kit

Subscriptions
   Free Subscription
   Subscribe
   DCD E-News Subscription

D4COST Software





  Oakbend Office Building, Page 46Oakbend Office Building
LEED® CERTIFICATION PENDING

Architect

Rataj - Krueger Architects, Inc.
10777 Sunset Office Drive, #300, Sunset Hills, MO 63127
www.rkai.net



Location: 
St. Louis, Missouri
Total Square Feet: 18,800
Construction Period: Aug 2003 to July 2006

CONSTRUCTION TEAM
Structural Engineer: Ibrahim Engineering - 11500 Olive Boulevard, #200, St. Louis, MO 63141
General Contractor: Sitelines, Inc. - 615 S. Vandeventer Avenue, St. Louis, MO 63110
Mechanical & Electrical Engineer: Belle Engineering, LLC - 9309 Aster Avenue, St. Louis, MO 63125
LEED® Certification Consultants: Hellmuth and Bicknese Architects - 4112 West Pine Boulevard, St. Louis, MO 63108
CIVIL ENGINEER: Wind Engineering - 122 N. Kirkwood, Kirkwood, MO 63122


Located on a tree-covered residential site in St. Louis, the Owner required retention of the 150 year plus oak and cataba trees. Sustainable civil design features re-engineered the site to be environmentally friendly with a connection to the bike trail. 

Rataj-Krueger Architects, Inc. designed pier and above grade, grade beam to avoid the tree root system, while tree roots were pruned prior to excavation, and shoring allowed for limiting overdig.

The variety of the exterior materials and textures used throughout encouraged exploration of shapes and forms and patterns which complimented the character of the site. The use of elements such as clearstory windows, light tubes, operable windows, and glass block allowed natural light and ventilation, in addition to the 90% outside views as part of the LEED®’s criteria. The concrete form masonry unit system (CFMU) enabled the building to utilize the exposed stone finish, and smooth exposed for the interior, while providing a R-21 structural wall system finished on the exterior and interior. 

LEED® certification distinguishes building projects that have demonstrated a commitment to sustainability, energy efficiency, and ability to recycle by meeting the highest performance standards while taking advantage of the environment. The key to Green Solutions in new commercial construction is the consideration of the overall building’s thirty year life cycle and it’s re-use. Rataj-Krueger Architects, Inc. together with Wind Engineering addressed the unique challenges and opportunities of implementing green building strategies, commercial office building and site to create sense of community.

MANUFACTURERS/SUPPLIERS
DIV 03:
Concrete Form Masonry Unit System: Pentstar. 
DIV 07: Metal Roof: Petersen Aluminum; Membrane: Firestone. 
DIV 08: Entrances & Storefronts: EFCO Corporation; Windows: Quaker; Light Tubes: Solatube.

Subscriber Login

 


©2015 Copyright DC&D Technologies, Inc. All rights reserved. Email: webmaster@dcd.com