Welcome to DCD.com!
ABOUT DCD    THE MAGAZINE    D4COST    CONTACT    HOME
Welcome to DCD.com!
ISSUE ARCHIVE     CURRENT ISSUE     CASE STUDIES   

 Current Issue
 Click here to
 read the issue.
Click Here To Access The DCD Archives™
Subscriber Login

Content/Departments
   Current Issue
   Issue Archive
   Specifiers Spotlights
   Building Products Revue
   TradeWinds
   Technical Articles
   Insights
   Case Studies
   DCD Sq. Ft. Cost Guides

   Cost Trends


Advertising
   Media Kit

Subscriptions
   Free Subscription
   Subscribe
   DCD E-News Subscription

D4COST Software


Arch Aluminum & Glass Co., Inc.


  Minnesota School of Business, Page 32Minnesota School of Business
DESIGN/BUILD

WINKELMAN BUILDING CORPORATION
340 Highway 10 South, St. Cloud, MN 56304
www.winkbuild.com


ARCHITECT
MAHLER & ASSOCIATES ARCHITECTURE
325 N. 33rd Avenue, #107, St. Cloud, MN 56303
www.mahlerarchitecture.com



Location: 
Waite Park, Minnesota
Total Square Feet: 40,500
Construction Period: June 2004 to Oct 2004 

CONSTRUCTION TEAM
STRUCTURAL/CIVIL ENGINEER: Duffy Engineering & Associates, Inc. - 350 Highway 10 South, #101, St. Cloud, MN 56304 
COST ESTIMATOR: Winkelman Building Corporation - 340 Highway 10 South, St. Cloud, MN 56304

Faculty and staff at Minnesota School of Business are now enjoying their new facility located on Highway 23 in the heart of Waite Park, Minnesota.

A new, two-story commercial/ educational facility with approximately 20,000 square feet per floor was completed in two separate packages: shell and first floor interior finishes.

This unique building features site cast concrete "THERMOMASS" tilt-up wall panels with in-set brick veneer. The upper wall area utilizes a textured spray applied paint finish. The gypsum concrete floor underlayment, FIRM-FILL® 3310 by Hacker Industries, Inc., can be poured before or after drywall and provides compressive strengths up to 3300 psi and delivers exceptional fire rating properties for added safety and sound control for comfort.

Due to a tight time schedule, this building was constructed in 120 days from groundbreaking to client occupancy. Winkelman Building Corporation turned over the facility to the owner without a hitch as a result of the combined hard work and team effort of project manager, Darren Fenster and field superintendent, Mike Goeden. Recently, Winkelman Building Corporation began the third package of this project: the second floor build out.

MANUFACTURERS/SUPPLIERS
DIV 03:
Gypsum Underlayment: Hacker Industries, Inc. Firm-Fill® 3310; In-Set Brick Veneer: Scott System, Inc.: Insulated System for Concrete Sandwich Walls: THERMOMASS.
DIV 07: Membrane: Carlisle SyntTec.
DIV 08: Aluminum Storefronts, Windows, Glazing: CMI Architectural Products.

Subscriber Login

 


©2015 Copyright DC&D Technologies, Inc. All rights reserved. Email: webmaster@dcd.com