Welcome to DCD.com!
ABOUT DCD    THE MAGAZINE    D4COST    CONTACT    HOME
Welcome to DCD.com!
ISSUE ARCHIVE     CURRENT ISSUE     CASE STUDIES   

 Current Issue
 Click here to
 read the issue.
Click Here To Access The DCD Archives™
Subscriber Login

Content/Departments
   Current Issue
   Issue Archive
   Specifiers Spotlights
   Building Products Revue
   TradeWinds
   Technical Articles
   Insights
   Case Studies
   DCD Sq. Ft. Cost Guides

   Cost Trends


Advertising
   Media Kit

Subscriptions
   Free Subscription
   Subscribe
   DCD E-News Subscription

D4COST Software


Subscribe to Design Cost Data Magazine!


  Estes Family Middle School Building, Kingswood Oxford School, Page 26Estes Family Middle School Building, Kingswood Oxford School
ARCHITECT

DU BOSE ASSOCIATES, INC. ARCHITECTS
49 Woodland Street, Hartford, CT 06105
www.dbarch.com


Location: 
West Hartford, Connecticut
Total Square Feet: 26,862
Construction Period: May 2002 to Aug 2003

CONSTRUCTION TEAM
STRUCTURAL/MECHANICAL/ELECTRICAL ENGINEER: BJFW, Inc. - 31 Ensign Drive, Avon Park North, Avon, CT 06001
GENERAL CONTRACTOR: The FIP Corporation - 10 McKee Place, Cheshire, CT 06410
COST ESTIMATOR: The Pike Company - P.O. Box 436, Kensington, CT 06037

As part of its Master Plan, the Kingswood Oxford School located in a residential section of West Hartford, Connecticut, wished to relocate their middle school program from a remote location and incorporate it into their main campus. The neighborhood was traditional and resembled a New England Village with small scale structures that were predominantly brick.

The new facility, which incorporates the original headmaster's house and the rear facade of the main administration building, forms an intimate courtyard and was designed to reflect a very warm and inviting residential character. The brick facade needed to match the modified Flemish bond palette used in the headmaster's house to which the new middle school building connects. The color of the brick facade was chosen for its warmth and ability to mediate between its immediate neighbors and to create a cohesive palette framing the courtyard.

The Estes Family Middle School Building, completed in August of 2003, blends completely with the Kingswood Oxford School and its surroundings.

MANUFACTURERS/SUPPLIERS
DIV 07:
EPDM: Firestone.
DIV 08: Windows: Graham Windows.
DIV 10: Lockers: Republic.
DIV 11: Unit Kitchens: Dwyer Kitchen.


©2015 Copyright DC&D Technologies, Inc. All rights reserved. Email: webmaster@dcd.com