Welcome to DCD.com!
ABOUT DCD    THE MAGAZINE    D4COST    CONTACT    HOME
Welcome to DCD.com!
ISSUE ARCHIVE     CURRENT ISSUE     CASE STUDIES   

 Current Issue
 Click here to
 read the issue.
Click Here To Access The DCD Archives™
Subscriber Login

Content/Departments
   Current Issue
   Issue Archive
   Specifiers Spotlights
   Building Products Revue
   TradeWinds
   Technical Articles
   Insights
   Case Studies
   DCD Sq. Ft. Cost Guides

   Cost Trends


Advertising
   Media Kit

Subscriptions
   Free Subscription
   Subscribe
   DCD E-News Subscription

D4COST Software


Subscribe to Design Cost Data Magazine!


  Stormont-Vail HealthCare New Surgery Addition & Renovation, Page 30Stormont-Vail HealthCare New Surgery Addition & Renovation
ARCHITECT
HMN ARCHITECTS, INC.
10901 Lowell Avenue, #280, Overland Park, KS 66210
www.hmnarchitects.com


Location: 
Topeka, Kansas
Total Square Feet: 163,825
Construction Period: Jan 2001 to June 2003

CONSTRUCTION TEAM
STRUCTURAL ENGINEER:
Finney & Turnipseed, P.A. - 603 Topeka Boulevard, Topeka, KS 66603
GENERAL CONTRACTOR: Ferrell Construction of Topeka, Inc. - P. O. Box 750107, Topeka, KS 66675
MECHANICAL & ELECTRICAL ENGINEER: Brack & Associates - 2953 S.W. Wanamaker Drive, Topeka, KS 66614
LANDSCAPE ARCHITECT: Skinner Garden Store - 4237 Silver Lake Road, Topeka, KS 66618


Stormont-Vail HealthCare in Topeka, Kansas, a long-time partner with HMN Architects, Inc. in Overland Park, Kansas, had outgrown their surgery department and was in need of an entirely new unit. After working with the hospital and conducting meetings and interviews with the surgery department, the team developed a plan that accommodated both the hospital's and the community's growing needs.

The replacement surgery and central sterile addition includes 18 new spacious operating rooms, 15 of which were entirely built-out and equipped. The remaining three are shelled space for future expansion. The new department also houses 25 new Pre/Post-Op rooms and a new 19-bay post anesthesia care unit (PACU). A new large central sterile / decontamination unit with sterilization, prep-pack, and clean storage supports the sizable department.

The expansion and renovation also called for a new hospital entry and lobby, because the hospital wanted an atmosphere that was more inviting for patients and their families and other visitors, as well as the staff. A large contemporary canopy identifies the new entry, complimenting the exterior of the existing facility, while giving it more of a modern and innovative look.

Warm tones utilized throughout the new lobby, waiting areas, and surgery registration area create a comforting and healing environment, so that patients and family members can feel more at ease. Special rooms in the waiting areas designated for children allow them to keep busy while they wait. Family rooms adjacent to the waiting areas provide a quiet environment to allow for discussions between physicians and family, as well as provide privacy.

Other features of the expansion project include a new distribution warehouse, receiving area, and three-bay loading dock; an expanded CCU waiting room; and staff support area including generously sized locker rooms, offices, and conference rooms.

MANUFACTURERS/SUPPLIERS
DIV 07:
EIFS: STO; Membrane Roof: Genflex.
DIV 08: Windows, Entrances & Storefronts: EFCO Corporation; Hollow Metal Doors & Frames: Curries; Wood Doors & Frames: Graham; Hardware: Pemko, Schlage, LCN, Von Duprin, Stanley, Rockwood.
DIV 09: Carpet: Shaw, Collins & Aikman; VCT: Armstrong, Mannington; Sheet Vinyl: Tarkett.
DIV 10: Lockers: Lyon.
DIV 14: Elevator: KONE.


©2012 Copyright DC&D Technologies, Inc. All rights reserved. Email: webmaster@dcd.com