Welcome to DCD.com!
ABOUT DCD    THE MAGAZINE    D4COST    CONTACT    HOME
Welcome to DCD.com!
ISSUE ARCHIVE     CURRENT ISSUE     CASE STUDIES   

 Current Issue
 Click here to
 read the issue.
Click Here To Access The DCD Archives™
Subscriber Login

Content/Departments
   Current Issue
   Issue Archive
   Specifiers Spotlights
   Building Products Revue
   TradeWinds
   Technical Articles
   Insights
   Case Studies
   DCD Sq. Ft. Cost Guides

   Cost Trends


Advertising
   Media Kit

Subscriptions
   Free Subscription
   Subscribe
   DCD E-News Subscription

D4COST Software


Subscribe to Design Cost Data Magazine!


  Front Royal Virginia Post Office, Page 56Front Royal Virginia Post Office
ARCHITECT OF RECORD
THE MARSHALL GROUP, LTD.
1120 Roger Bacon Drive, #11, Reston, VA 20191
www.marshallgparchitects.com
--
GENERAL CONTRACTOR
RICKETTS CONSTRUCTION CO., INC.
36 Ricketts Drive, Winchester, VA 22601


Location: 
Front Royal, Virginia
Total Square Feet: 25,684
Construction Period: Apr 2001 to Oct 2002 

Construction Team
ARCHITECT/STRUCTURAL ENGINEER: The Marshall Group, Ltd. - 11250 Roger Bacon Drive, #11, Reston, VA 20191
GENERAL CONTRACTOR: Ricketts Construction Co., Inc. - 36 Ricketts Drive, Winchester, VA 22601
ELECTRICAL & MECHANICAL ENGINEER: Mendoza, Ribas & Farina - 6265 Executive Boulevard, Rockville, MD 20852
CIVIL ENGINEER: Cervantes & Associates - 3701 Pender Drive, #110, Fairfax, VA 22030
COST ESTIMATOR: Ricketts Construction Co., Inc. - 36 Ricketts Drive, Winchester, VA 22601


The new main post office in Front Royal, Virginia is the result of the efforts of the Design Build Team of Ricketts Construction and The Marshall Group. The Marshall Group is the Architect of Record.

The design is based on the current USPS design criteria to support a projected population in the year 2012 of 34,870, with 15,205 deliveries per day over 27 Routes and 2,256 post office boxes. The new post office replaces the old post office on an expanded site in the same location. The building contains 25,684 square feet housing the main lobby, box lobby, postal store, administrative space, and work room and support spaces.

The expanded site contains 2.56 acres. In addition to the new building, parking is provided for a total of 134 vehicles including employee, customer and official vehicles. Of this total 50 spaces are specifically set aside for customers.

The project team established a "Partnering" agreement at the outset which resulted in accomplishing the project within budget and on schedule. The building was occupied in October 2002 and has received compliments from the Postal Service and the community.

MANUFACTURERS/SUPPLIERS
DIV 04:
Split Face, Ground Face CMU: Supreme Block; Brick: Glen Gery.
DIV 07: Metal Roofing: Englert Inc.; EIFS: Dryvit; EPDM: Firestone.
DIV 09: VCT: Armstrong Excelon; Carpet: Lees.