Welcome to DCD.com!
ABOUT DCD    THE MAGAZINE    D4COST    CONTACT    HOME
Welcome to DCD.com!
ISSUE ARCHIVE     CURRENT ISSUE     CASE STUDIES   

 Current Issue
 Click here to
 read the issue.
Click Here To Access The DCD Archives™
Subscriber Login

Content/Departments
   Current Issue
   Issue Archive
   Specifiers Spotlights
   Building Products Revue
   TradeWinds
   Technical Articles
   Insights
   Case Studies
   DCD Sq. Ft. Cost Guides

   Cost Trends


Advertising
   Media Kit

Subscriptions
   Free Subscription
   Subscribe
   DCD E-News Subscription

For more information on products used in this project visit
Pemko

D4COST Software


Subscribe to Design Cost Data Magazine!


  Ceres Fire Station No. 1, Page 40Ceres Fire Station No. 1
ARCHITECT
CALPO HOM & DONG ARCHITECTS
2150 Capitol Avenue, #200
Sacramento, CA 95816
www.chdarchitects.com


Location: 
Ceres, California
Total Square Feet: 15,241
Construction Period: Mar 2002 to Feb 2003

Construction Team
PROGRAM/CONSTRUCTION MANAGER: Harris & Associates - 6435 N. Palm Avenue, #106, Fresno, CA 93704
GENERAL CONTRACTOR: J.L. Bray and Son, Inc. - 4501 Broadway Avenue, Salida, CA 95368
STRUCTURAL ENGINEER: Buehler & Buehler Structural Engineers, Inc. - 600 Q Street, #200, Sacramento, CA 95814
CIVIL ENGINEER: Warren Consulting Engineers, Inc. - 160 Blue Ravine Road, #C, Folsom, CA 95630
ELECTRICAL ENGINEER: Capitol City Design - 1751 Cebrian Street, West Sacramento, CA 95691
MECHANICAL ENGINEER: Sigma Engineering - 3517 Marconi Avenue, #204, Sacramento, CA 95821
COST ESTIMATOR: Bleckmann Construction Estimating - 2421 Rio Bravo Circle, Sacramento, CA 95826
LANDSCAPE ARCHITECT: KLA, Inc. - 142 South Washington Street, #1, Sonora, CA 95370

The City of Ceres had three simple requirements for their new replacement Downtown Fire Station No. 1. The new station must replace the existing civic building, circa 1960's, with a new fire station complete with drive-through apparatus bays, aprons for the engines both front and back, and house the administrative offices; The new station must be presentable on all four sides, particularly the rear elevation, which faces the freeway exit into town, and have a preferred "Traditional Fire Station" appearance; and Station costs must fall within a very stringent small town budget.

Squeezed into a +/- 0.75 acre site, between the four-story Public Safety Building and a one-story Court Building, and across the street from a public park, the new fire station was first laid out to accommodate the vehicular circulation requirements of the fire trucks and engines, as well as room for the required aprons.

The resulting rectangular building footprint, approximately 9,300 square feet, was laid out to accommodate triple double-deep apparatus bays plus a medic response bay, along with support space and administrative offices. Firefighter living quarters were designed above the administrative offices, and wrapping around the apparatus bays; in keeping with the City's desires for a "Traditional Fire Station", two brass sliding fire poles were placed to allow quick response for the firefighters to the apparatus.

The rectangular, two-story structure provided the proportions and shape prerequisite of a traditional fire station form. Exterior finishes of brick veneer and plaster are highlighted by foam mouldings creating the building cornices and trim. Arched parapets highlight the three facades of the apparatus room, providing a signature appearance and contrast to the horizontal lines of the brick and storefront systems. The traditional facades can be recognized at many vistas in the City, as well as the adjacent freeway. The resultant traditional forms are accented by masonry arches over the apparatus doors and an ornamental iron fence around the site.

Fire Station No. 1 was designed to accommodate built-in expansion for both apparatus and firefighter crews, providing for orderly growth within a given footprint, and avoiding future exterior construction which may cause interruptions to response calls and operations. The apparatus room is designed to accommodate future vehicles, while the living quarters were designed to accommodate the future growth to a crew of eight plus a Batallion Chief. Dormitories are semiprivate rooms, with casework locker accommodations for three shift crews. Bathrooms are unisex, self-contained, with water closet, lavatory, and shower. Administration offices allow for growth and accommodation of future administrative positions.

The conciseness of the plans and the complete cooperation amongst Owner, Design Team, and Program/Construction Manager Teams, allowed for a very competitive bidding atmosphere. This cooperation continued with the selected general contractor, resulting in a project built within budget, meeting the Fire Department's operations requirements, and the City's civic requirements. Project change order costs were less than 5% of the construction costs.

MANUFACTURERS/SUPPLIERS
DIV 03:
Cementitious Underlayment: USG Levelrock(TM).
DIV 04: Thin Brick: H.C. Muddox.
DIV 07: Single Ply: Carlisle.
DIV 08: Windows: Columbia Commercial Building Products; Aluminum Storefront: Vistawall; Special Doors: Wayne Dalton; Hardware: Schlage, Von Duprin, LCN, Pemko, Trimco.
DIV 09: Gypsum: National; Acoustical Treatment: Armstrong; Carpet: Patcraft; Rubber Base: Roppe.