Welcome to DCD.com!
ABOUT DCD    THE MAGAZINE    D4COST    CONTACT    HOME
Welcome to DCD.com!
ISSUE ARCHIVE     CURRENT ISSUE     CASE STUDIES   

 Current Issue
 Click here to
 read the issue.
Click Here To Access The DCD Archives™
Subscriber Login

Content/Departments
   Current Issue
   Issue Archive
   Specifiers Spotlights
   Building Products Revue
   TradeWinds
   Technical Articles
   Insights
   Case Studies
   DCD Sq. Ft. Cost Guides

   Cost Trends


Advertising
   Media Kit

Subscriptions
   Free Subscription
   Subscribe
   DCD E-News Subscription

D4COST Software


Subscribe to Design Cost Data Magazine!


  Bartow Memorial Hospital, Page 34Bartow Memorial Hospital
Architect: 
Gresham Smith & Partners 
300 South Hyde Park Ave., #201, Tampa, FL 33606


Location: 
Bartow, Florida
Total Square Feet: 119,989
Construction Period: Sep 1998 to Dec 1999

Construction Team
General Contractor: Bovis Lend Lease - 1801 West End Avenue, #600, Nashville, TN 37203
Structural Engineer: Gresham Smith & Partners - 1400 Nashville City Center, 500 Union St., Nashville, TN 37219
Electrical & Mechanical Engineer: Tilden, Lobnitz & Cooper - 1809 Art Museum Dr., #109, Jacksonville, FL 32207
Landscape Architect: Anderson-Lesniak Associates - 4326 El Prado Blvd., Tampa, FL 33629
Cost Estimator: Bovis Lend Lease - 1801 West End Avenue, #600, Nashville, TN 37203


Bartow Memorial Hospital is a new 125,000-square-foot health care facility located in Bartow, Florida. It replaces an antiquated 75-year-old, 54,000-square-foot building. The hospital accommodates 56 inpatient beds, including a 6 bed intensive care unit, a labor and delivery suite with C-section room and 4 operating rooms. The two-story facility, and an adjacent new 23,000-square-foot medical office building are sited on a greenfield pasture in Polk County.

A design that complemented the character of their city was critically important to the hospital staff. Bartow is a small rural town with a historic downtown main street, impressive landmark buildings, and oak shaded neighborhoods with plantation and cracker style homes. The design team responded by integrating elements that create a sense of harmony with the architectural style of nearby downtown and neighborhoods. Two story patient wings mirror the scale and proportion of main street buildings. Stair towers relate to traditional forms such as clock towers. Roof brackets are derived from the exposed structure of local rural buildings. Silver metal roofs on towers and canopies are reminiscent of those used widely throughout the area. Entrance canopies are the institutional equivalent of a residential front porch, creating an impression of welcome and hospitality. Incorporating familiar elements into the building facade helps to give patients and their families a comfort level during what can be a very stressful experience.

Functionally, the floor plan addresses critical areas of hospital design: patient and staff flow and future expansion. Outpatient Diagnostics and Treatment, Surgery, Emergency Department, Physical Therapy and public spaces are immediately accessible to the front entrance. Departmental zoning aids in separation of public and patient traffic with minimal "crossovers." Vertical circulation is segregated between an elevator bank that serves visitors and one that serves staff and patients. 

Horizontal expansion is anticipated by the siting of the building and configuration of corridors, especially in the surgical unit. The cruciform patient wing arrangement will accommodate one additional second floor nursing unit. The building structure is capable of supporting third floor expansion.

An important goal for the design and construction team was meeting the Owner's schedule expectations. Contractor selection at project initiation allowed real-time cost estimating as the design progressed. Partnering sessions created the opportunity for all stakeholders to come together as a team. "Early release" civil and foundation packages were prepared so that permitting and sitework could commence while construction documents were completed. When negotiations for the original hospital site fell through during the design development phase and a new site was selected, the floor plan was reversed and the entire site design reworked in only 4 weeks. Once final building permits were secured, the facility construction was completed in 14 months. "Heroic" efforts included flying in a manufacturer's representative from Canada on a half-day's notice to certify imaging equipment for state code officials, days prior to the hospital's opening.

Each project, no matter how large or small, is essentially the sum of three components: scope, schedule, and budget. By working together as a team, the Owner, Architect and Contractor were able to create a building that is functionally successful, delivered on time, and under budget.

Manufacturers/Suppliers
Exterior Walls - Skylights: Kalwall; Metal Windows: Wausau Window & Wall; Entrances & Storefronts: Kawneer; EIFS: STO Corp.
Roof - Membrane: Carlisle.
Floors - VCT, Resilient: Armstrong.
Interior Walls - Gypsum Board: United States Gypsum; Wood & Plastic Doors: VT Industries.
Elevators - Otis.